Keep in mind,
there are many people working on this job site, all doing different simultaneous tasks.
Here, you see the earth being bulldozed back into place around the footers that are
going to be submerged by the lake.
|
The structure
progresses. On the bottom of the above photo, you see the sections of structure
waiting to be lifted into place. Once the crane picks up a section of structure, it
is set directly down onto the concrete footers, bolted into place, as seen below, and then
the wood "ties" are used to connect the sections together.
|